COMPARATIVE ANALYSIS OF CONDUIT STRUCTURE QUANTITY TAKE-OFF USING BUILDING INFORMATION MODELING (BIM) AND CONVENTIONAL METHODS : A CASE STUDY OF CABEAN DAM, BLORA REGENCY

Penulis

  • Bhagyawan Rizqol Rizqol Jannata
  • Putri Anggi Permata Suwandi Program Studi Teknik Sipil, Fakultas Teknik dan Informatika, Universitas PGRI
  • Ikhwanudin Program Studi Teknik Sipil, Fakultas Teknik dan Informatika, Universitas PGRI
  • Muslimin Teknik Sipil, Fakultas Sains dan Teknologi, Universitas Islam Nahdlatul Ulama Jepara
  • Firmansyah Maulana Teknik Sipil, Fakultas Teknik, Universitas Islam Darul 'Ulum Lamongan

DOI:

https://doi.org/10.52166/saintis.v2i02.12467

Kata Kunci:

Building Information Modeling (BIM), Quantity Take-Off, Autodesk Revit, Cabean Dam, Cost Efficiency

Abstrak

Quantity Take-Off (QTO) calculation is a crucial element in construction cost management. Conventional methods based on 2D drawings are often prone to interpretation errors and human error, resulting in inaccurate cost estimates. This study aims to evaluate the effectiveness of implementing Building Information Modeling (BIM) in performing QTO for the Diversion Conduit structure at Cabean Dam, Blora Regency. The research method involved remodeling the conduit design using Autodesk Revit 2025 software to obtain concrete volume and reinforcement weight, which were then compared with conventional calculation results and field realization data. The results showed that the BIM method produced more efficient volumes compared to the conventional method. In concrete work, the BIM volume was 1.03% lower than the conventional method, while in reinforcement work (deformed bars), BIM was 7.35% more efficient. When compared with field realization data, the BIM volume represented the net quantity, with an average difference of 0.6% for concrete and 3.5% for reinforcement, representing the waste factor. This study concludes that BIM offers higher accuracy and minimizes project budget over-estimation.

Unduhan

Data unduhan belum tersedia.

Referensi

Fawji, M., Cahya, E., & Dermawan, V. (2022). Implementasi 6D Building Information Modelling (BIM) pada saluran pengelak Bendungan Margatiga dengan aplikasi Civil 3D dan HEC-RAS 2D. Malang.

Hendra, D., Karsono, B., Olivia, S., & Azhar. (2022). Pengenalan peran platform digital BIM (Building Information Modelling) dalam program Autodesk Revit bagi masyarakat pelajar Kota Lhokseumawe. Aceh.

Kementerian PUPR Direktorat Jenderal Sumber Daya Air. (2023). Surat Edaran Nomor 04/SE/Da/2023 tentang pedoman penerapan pemodelan informasi bangunan (Building Information Modelling) pada perencanaan teknis dan pelaksanaan konstruksi infrastruktur sumber daya air. Jakarta: Kementerian PUPR.

Soleh, I. M., & Saputro, C. D. (2023). Implementasi Building Information Modelling level 5D pada proyek bangunan air. Yogyakarta.

Ridwan, M. R. M., Farizal, M., Suwandi, P. A. P., & Ikhwanudin. (2025). Perbandingan quantity take off metode konvensional dan BIM pada struktur spillway Embung MBH IKN. Semarang.

Diterbitkan

2025-12-30

Cara Mengutip

Jannata, B. R. R., Putri Anggi Permata Suwandi, Ikhwanudin, Muslimin, & Firmansyah Maulana. (2025). COMPARATIVE ANALYSIS OF CONDUIT STRUCTURE QUANTITY TAKE-OFF USING BUILDING INFORMATION MODELING (BIM) AND CONVENTIONAL METHODS : A CASE STUDY OF CABEAN DAM, BLORA REGENCY. SAINTIS Jurnal Ilmu-Ilmu Eksakta, 2(02), 141–144. https://doi.org/10.52166/saintis.v2i02.12467